The Lean and 6 Sigma

Go to Quiz 1 – 2 – 3 – 4 – 5 – 6 – 7 – 8 – 9 – 10 – 11

Lean Terminology, Wastes and VSM

Each T/F -> 1 pts, Multiple Choice ->2 pts, Multiple selection -> 4 pts. Weighted in %.

1 / 5

Category: Lean 3

In Lean environment the production system should be seen as group of cells following each other.

2 / 5

Category: Lean 3

Which of the following is false for the Value Stream Mapping (VSM) applications?

3 / 5

Category: Lean 3

Which of the following sentence is false?

4 / 5

Category: Lean 3

Which of the following is not classified as waste?

5 / 5

Category: Lean 3

Work flow design usually are done around monuments.

Your score is

The average score is 0%